Email:
Message:
captcha
Shandong Wind Power

海上风电(1).jpg


In 2020,Yubo started batch supply for CRRC Shangdong Wind Power Co., LTD.'s project


Since China's first large-scale offshore wind farm, Shanghai Donghai Bridge project was completed in 2010, the special environmental limitations and broad prospects of offshore wind farms have draw our attention and have inspired us to develop a number of targeted products.

In 2020,  the joint filter reactor we developed had successfully integrated in the wind power converter integration container of CRRC Shandong Wind Power, and passed the trail run in the turbine assembling factory in Mid-Bohai Regional Offshore Wind Power Industry Base. Our product will make full use of the abundant wind energy resources of Bohai Sea and provide areas including Shandong and Hebei with high-quality, clean and affordable power resources.

When designing the reactor, our R&D team and product department had adhered to the ongoing characters of making long life and high protection productions, and had given full consideration to the low temperature, humidity, salt spray corrosion, grid voltage imbalance, difficult maintenance and other factors. Therefore these filter reactors are able to obtain recognition of our customers.



Provide customers with comprehensive services
E-mail:
yuboelectric@yubo-electric.com
Company address:
No. 12 Wanggang Road, Jinnan Economic Development Zone (West), Jinnan District, Tianjin City, Zone A, 300350
Copyright ◎ Tianjin Yubo Electrical Equipment Co., Ltd 津ICP备15005007号-1